Back to Blog
Power supply on off switch5/30/2023 Swing both ejection levers to the fully open position.ī. Insert the new power supply into the chassis by completing the following steps ( FIGURE 3):Ī. Place the failed power supply in the packing materials so that you can return it to Oracle for proper disposal.ģ. Swing the ejection levers fully outward to eject the power supply from the chassis.Ĭaution - Be careful to not damage the circuit board connector extending from the back of the power supply.Ĭaution - Follow all ESD precautions (see ESD Precautions) and use care when handling either the new or failed power supply.Ģ. Loosen the two captive screws on the power supply ejection levers. Remove the power supply from the system ( FIGURE 2):Ī. Unplug the power cord from its power supply connector.ĥ. Remove the power cord tie strap from the power cord.Ĥ. The power supply fault or fan fault LED is amber ( FIGURE 1).Ģ.Ğnsure that the power supply on/off switch is in the “O” (off) position.ģ. Only trained personnel with authorized access to this equipment should remove and replace modules in the system.ġ.ğrom the back of the cabinet, locate the failed power supply. The power supplies in this equipment can produce high energy hazards. ![]() ![]() Never remove a power supply unless the power fault LED or fan fault LED is amber ( FIGURE 1).Ĭaution - Electrical shock hazard. See To Verify the Installation.Ĭaution - Potential loss of data access. To replace a failed power supply, you must complete the following steps, which are described in detail in the remainder of this guide:ġ.
0 Comments
Read More
Leave a Reply. |